May through June 2013
The buildings on the site were removed to make way for the light rail station.
			
				
				A long-armed excavator with a “nibbler” attachment severs steel beams like they were paper.
				
			
				
				A second excavator takes the refuse and neatly stacks it into recyclable and non-recyclable piles.
				
			
				
				Not much left of the bank.
				
			
				
				The concrete box is the bank vault. Its thick concrete walls soon yielded to the hydraulic breaker.
				
			
				
				There was a lot of rebar in that vault. It all got hauled off to be recycled.
				
			
				
				The former UW building didn’t take long to demolish.
				
		 
	 
	
	
			 
	 
		