U-District Light Rail Station 7 – Site Excavation Continues Gallery November 14, 2015 Eric Kool-Brown October and November 2014 The digging and site preparation continue into the fall of 2014. The north end of the station box pit. The north end of the station box pit. Pushing dirt The south end of the station box pit. The south end of the station box pit. The south end of the station box pit. The south end of the station box pit. Compressor delivery by airmail. The north end of the station box pit. The north end of the station box pit. A drill boring a hole for a soil anchor. A drill boring a hole for a soil anchor. Building a bridge over the south end of the station box pit. Building a bridge over the south end of the station box pit. Building a bridge over the south end of the station box pit.