U-District Station 8882

Retaining wall construction

Moving the hydraulic jacking fixture.

These holes were around 4 feet in diameter. A steel casing was inserted as the hole was bored to prevent cave-ins. The jacking fixture removes the casing as the hole is filled with concrete.