Picture #019 in A Day in the Life of a Tomography Mooring
Once the source package goes over the side, there is not much else
to put out but about 3500 m (about 2 miles) of wire rope and kevlar cable. The day
grows long, the people grow weary, while the kevlar continues to pay out.