|
The tilt meter/compass package and the hydrophone array is slowly
fed out to sea using a slip line - a loop of line that will be pulled back
in once the tension of the mooring has been transferred to the source cage.
Lloyd holds a hydrophone element to be sure it gets over the side safely.
|