U-District Station 2032

November 8, 2015 3495 × 2621 2 – Demolishing the Existing Buildings
The concrete box is the bank vault. Its thick concrete walls soon yielded to the hydraulic breaker.

The concrete box is the bank vault. Its thick concrete walls soon yielded to the hydraulic breaker.

Previous Image
Next Image

A photographic archive of some recent UW construction projects

Table of Contents

  • Tunnel Boring Machine Undergoing Maintenance
  • The First TBM Arrives!
  • 9 - Station Box Ready for the Boring Machine
  • 8 - A Conveyor Removes Dirt
  • 7 - Site Excavation Continues
  • 6 - Site Excavation Begins
  • 5 - Boring the Excavation Support Pilings
  • 4 - UW Tower Chiller Lift
  • 3 - Site Preparation
  • 2 - Demolishing the Existing Buildings
  • 1 - Brooklyn Street Before Light Rail

Categories

  • U-District Light Rail Station
  • Welcome Page

Recent Posts

  • Tunnel Boring Machine Undergoing Maintenance
  • The First TBM Arrives!
  • 9 – Station Box Ready for the Boring Machine
  • 8 – A Conveyor Removes Dirt
  • 7 – Site Excavation Continues

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
Proudly powered by WordPress