Hub Halves and Ring Gears
This is one of the finished right hub halves, outside view. This is part 2, drawing 4. |
This is one of the finished right hub halves, inside view. This is part 2, drawing 4. |
This is one of the finished left hub halves, outside view. This is part 1, drawing 4. The spokes holes are offset 10 degrees from the right hub half. |
This is one of the finished left hub halves, inside view. This is part 1, drawing 4. The alignment dowel pins are pressed in these halves. |
Here is a shot of the finished ring gears. Three of the holes are 1/4-20 clearance. The other three are 0.251" for the dowel pins. |
This is a shot of the hub halves and the ring gears all together. Detail is lacking here but there are parts for two hub assemblies here. |
This is the hub stackup as viewed from the right hub half through which the ring gear can be seen. |
Here are the two views of the stackup. Two units, one of them is just flipped over. |
Photos by Greg Harper